HZMB
General layout

start from HK boundary crossing
55kmi
- 30km = 24km bridge + 6km IT
- 12km : In HK
- 14km : Zhuhai link road
There is 4 man-island, 4 tunnels, 22km bridge
Island is used to link bridges and tunnels
Project constraints
To across the 伶仃洋
- Earthquake
- Wind / Typhoo (47.6m/s)
- 120 years durability
- different Cons (in Chinese mainland and hk. masco)
There is 5 airports nearby, when the plane up and down
And there is also a 中华白海豚保护区 (Pearl river, 厦门,北部湾) 1,200
It has no vision, also have a 声呐系统
Its behaviour in 25m depths (Too deep is not available)
To find its behaviour, we go out to the sea more than 300 times
Finally, number all the 白海豚, so we can know its age, and made protected rules and equipments
Also the pollution may affect 白海豚
More than 4000 ships (more than 500T) per day
Also the affect by typhoon
Project goal
- To build a world-class sea-crosssing link
- To best serve the user : easy to maintain, easy to adapt to crash or other casual accidents (Like fire in tunnels)
- To become a land mark : beautify, historical, agreeable
Project concepts
- design : life cycle coast and design on demand
- construction : modular construction, standardized/mechanized
- Management
- Promote cooperation : based on self innovation, encourage integration of global resources to better sereve the project (HK/Macao platform)
- aim to promote sustainable development to be a model of green project
So first to see all the best bridges in the world, and to design our new constructed methods.
Use the best materials and equipment. (Borrow or invented by ourselves)
Industrialization : only in the factory can make the better. And the use to transfer and install it (So it is relevant to different kinds of equipment)
Learn from others, but rooted in self-introduction.
Prepare some monitors , so we can better know whether it can survive for more than 120 years
Sustainable : environmental-friendly.
Labor-friendly : AC in the tunnels
Artificial Island : link the bridge and tunnels (so the island can be a bit longer, but not to long, or it will prevent the water)
Another problem :
When the bank become wider, the speed of flow become lower, and the sand will land on the river bed. So the ocean will have so many sand
But the 涨落潮 every day to get the sand out. So the ocean become the sank stable.
But it is also very susceptible and weak. If the bridge prevent the water, it may affect the sand to go. As this river affect many fields
The 墩子 become wider
Under the 桥墩, it has a 桥台, make it smaller
Island quik forming method
The island can’t be moved. It need to be precise and stable
It has a big T joint (shorter the time in half a year), and it also has be cheaper
Immersed tunnel
It is very clean
Elastic materials, the maintenance tunnel is made by light concrete (undecorated)
New crafts
5664m, 33 Elements,
Use the pressure of water and temperature to push the Gina from 33 inches to 22
So it can prevent the water leaking
Integrated control system for tunnel sinking and joining :
Design and construction of final joint
Special ships developed for IT construction
- Rock laying and hammering bare
- Bed material supplier barge
- Jack-up barge for gravel laying and levelling : 3D-printing underwater
- Siltation removing system
- Towing navigation system
- Mooring system
- Ballasting system : Balance and navigate system under water
- Pulling system
- Remote survey system : 水下声呐定位
- Fine tuning system max
Aesthetic Design
Chinese knot
Sailing away on wind and waves
Connect them together : 珠联璧合